1
/
of
1
Simplified Connection Process for Photovoltaic Systems >800 W (Former Enel Application) E-DISTRIBUZIONE
Simplified Connection Process for Photovoltaic Systems >800 W (Former Enel Application) E-DISTRIBUZIONE
Regular price
€990,00 EUR
Regular price
Sale price
€990,00 EUR
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
ATTENTION - SERVICE RESERVED FOR E-DISTRIBUZIONE USERS (POD IT001...)
HOW DO I FIND OUT WHO MY NETWORK DISTRIBUTOR IS?
go to this website
https://www.arera.it/area-operatori/ricerca-operatori
ATTENTION - THIS SERVICE COVERS EXCLUSIVELY THE SIMPLIFIED PROCEDURE. IT DOES NOT INCLUDE THE STANDARD PROCEDURE.
If the system does not meet even one of the requirements listed below (e.g. power greater than 11.08 kW, presence of other systems on the same POD, need for non-simple grid works, Medium Voltage connection, need for building permits), the application falls under the standard procedure and CANNOT be handled with this service. In case of doubt, contact us before purchasing.
REQUIREMENTS FOR THE SIMPLIFIED PROCEDURE
- Rated power up to 11.08 kW: the rated power is determined as the lower value between the sum of the peak power of the modules (STC) and the sum of the rated power of the inverters.
- Connection via inverter in Low Voltage (LV): the system must be connected in parallel to the e-distribuzione LV grid using one or more inverters.
- Active Low Voltage point of delivery (POD): the installation must be carried out at an end customer already equipped with an active Low Voltage supply.
- First system on the POD [NO PRE-EXISTING PHOTOVOLTAIC]: no other production systems must already be present and active at the same point of delivery.
- Installation in Free-Standing Buildings: the system must be installed on buildings, structures, or above-ground facilities or their related outbuildings, falling under activities that do not require any form of consent (art. 7-bis, c. 5, Legislative Decree 28/2011).
- Simple grid works: the connection must involve exclusively simple grid works for e-distribuzione (e.g. installation or reprogramming of the meter).
- Commercial arrangement: simultaneous request to the GSE for energy withdrawal (Ritiro Dedicato).
SERVICE DETAILS
This service allows you to comply with the requirements for the grid connection of a photovoltaic system with power greater than 800 W (up to 11.08 kW) through e-distribuzione's simplified procedure and includes:
- Preparation of the single-line diagram by a qualified technician
- Technical certification
- Completion of the procedure and communication modules on the e-distribuzione portal
IMPORTANT
The service DOES NOT include the declaration of conformity pursuant to Ministerial Decree 37/08, which must be drawn up by the electrician who will carry out the connection to your system
REQUIRED DOCUMENTS
In order to complete the application, you will need to provide us with:
- Declaration of conformity of the electrical system (AC part affecting the photovoltaic system) pursuant to Ministerial Decree 37/08, drawn up by an electrician
- Bill (for the POD number on which the system will be installed)
- Identity documents
- Credentials for accessing the distributor's portal (if you already have an account)
HOW IT WORKS
once you have purchased the service, you will be contacted within a few days at the email address or telephone number indicated during the ordering process
Share
