{"product_id":"iter-connessione-fotovoltaico-800-w-pratica-ex-enel-e-distribuzione-semplificato","title":"Simplified Connection Process for Photovoltaic Systems \u0026gt;800 W (Former Enel Application) E-DISTRIBUZIONE","description":"\u003cp\u003e\u003cspan style=\"color: rgb(247, 8, 8);\"\u003e\u003cstrong\u003eATTENTION - SERVICE RESERVED FOR E-DISTRIBUZIONE USERS (POD IT001...)\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv\u003e\u003cb\u003eHOW DO I FIND OUT WHO MY NETWORK DISTRIBUTOR IS?\u003c\/b\u003e\u003c\/div\u003e\n\u003cdiv\u003ego to this website\u003c\/div\u003e\n\u003cdiv\u003ehttps:\/\/www.arera.it\/area-operatori\/ricerca-operatori\u003c\/div\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(247, 8, 8);\"\u003e\u003cstrong\u003eATTENTION - THIS SERVICE COVERS EXCLUSIVELY THE SIMPLIFIED PROCEDURE. IT DOES NOT INCLUDE THE STANDARD PROCEDURE.\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv\u003e\u003cem\u003eIf the system does not meet even one of the requirements listed below (e.g. power greater than 11.08 kW, presence of other systems on the same POD, need for non-simple grid works, Medium Voltage connection, need for building permits), the application falls under the standard procedure and CANNOT be handled with this service. In case of doubt, contact us before purchasing.\u003c\/em\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cb\u003eREQUIREMENTS FOR THE SIMPLIFIED PROCEDURE\u003c\/b\u003e\u003c\/div\u003e\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRated power up to 11.08 kW:\u003c\/strong\u003e the rated power is determined as the lower value between the sum of the peak power of the modules (STC) and the sum of the rated power of the inverters.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConnection via inverter in Low Voltage (LV):\u003c\/strong\u003e the system must be connected in parallel to the e-distribuzione LV grid using one or more inverters.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActive Low Voltage point of delivery (POD):\u003c\/strong\u003e the installation must be carried out at an end customer already equipped with an active Low Voltage supply.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFirst system on the POD [NO PRE-EXISTING PHOTOVOLTAIC]:\u003c\/strong\u003e no other production systems must already be present and active at the same point of delivery.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInstallation in Free-Standing Buildings:\u003c\/strong\u003e the system must be installed on buildings, structures, or above-ground facilities or their related outbuildings, falling under activities that do not require any form of consent (art. 7-bis, c. 5, Legislative Decree 28\/2011).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSimple grid works:\u003c\/strong\u003e the connection must involve exclusively simple grid works for e-distribuzione (e.g. installation or reprogramming of the meter).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCommercial arrangement:\u003c\/strong\u003e simultaneous request to the GSE for energy withdrawal (Ritiro Dedicato).\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cdiv\u003e\u003cb\u003eSERVICE DETAILS\u003c\/b\u003e\u003c\/div\u003e\n\u003cp\u003eThis service allows you to comply with the requirements for the grid connection of a photovoltaic system with power greater than 800 W (up to 11.08 kW) through e-distribuzione's simplified procedure and includes:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ePreparation of the single-line diagram by a qualified technician\u003c\/li\u003e\n\n\u003cli\u003eTechnical certification\u003c\/li\u003e\n\n\u003cli\u003eCompletion of the procedure and communication modules on the e-distribuzione portal\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cdiv\u003e\u003cb\u003eIMPORTANT\u003c\/b\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cspan style=\"color: rgb(0, 0, 0);\"\u003e\u003cem\u003eThe service DOES NOT include the declaration of conformity pursuant to Ministerial Decree 37\/08, which must be drawn up by the electrician who will carry out the connection to your system\u003c\/em\u003e\u003c\/span\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cb\u003eREQUIRED DOCUMENTS\u003c\/b\u003e\u003c\/div\u003e\n\u003cdiv\u003eIn order to complete the application, you will need to provide us with:\u003c\/div\u003e\n\u003cdiv\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eDeclaration of conformity of the electrical system (AC part affecting the photovoltaic system) pursuant to Ministerial Decree 37\/08, drawn up by an electrician\u003c\/li\u003e\n\n\u003cli\u003eBill (for the POD number on which the system will be installed)\u003c\/li\u003e\n\n\u003cli\u003eIdentity documents\u003c\/li\u003e\n\n\u003cli\u003eCredentials for accessing the distributor's portal (if you already have an account)\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv\u003e\u003cb\u003eHOW IT WORKS\u003c\/b\u003e\u003c\/div\u003e\n\u003cdiv\u003eonce you have purchased the service, you will be contacted within a few days at the email address or telephone number indicated during the ordering process\u003c\/div\u003e","brand":"DinamoTech","offers":[{"title":"Default Title","offer_id":54828798574915,"sku":"ITER11KW","price":990.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0756\/7019\/2451\/files\/ECOMMERCEDINAMOTECHPRODUCTIMAGE_2_4c7f88e0-f884-40e7-b99b-932d29fbbc8c.png?v=1790052893","url":"https:\/\/dinamotech.it\/en\/products\/iter-connessione-fotovoltaico-800-w-pratica-ex-enel-e-distribuzione-semplificato","provider":"DinamoTech","version":"1.0","type":"link"}